“The Design of Project Risk Management to Mitigate Project Delay in the Onshore Construction Industry (A Case Study of a Shore Protection Project)” (2025) Management Analysis Journal, 14(4), pp. 509–523. doi:10.15294/maj.v14i4.26631.