OPTIMASI PENDANAAN PROYEK PEMBANGUNAN GEDUNG VELODROME DENGAN TEKNIK PEMROGRAMAN LINIER

Muhammad Faizal Ardhiansyah Arifin(1),


(1) Jurusan Teknik Sipil, Fakultas Teknik, Universitas Negeri Semarang (UNNES) Kampus Unnes Gd E4, Sekaran, Gunungpati, Semarang 50229

Abstract

The main resource in the execution of project to ensure the project goes according to the plan is the availability of funds that must be possessed by providers. The contract form and manner of payments made between service users and service providers during the implementation of the project would bring a significant impact for service providers to prepare a specific fun. Where funds provided will be used to maintain the condition project's cash flows remain positive or avoid a deficit. This study aims to inform the provider of construction services in the calculation of the most favorable providing funds where the payment method that is observed is a payment method payment stage.

 

Sumber daya utama di dalam pelaksanaan proyek untuk menjamin proyek tersebut berjalan sesuai rencana adalah ketersediaan dana yang harus dimiliki oleh penyedia jasa. Bentuk kontrak dan cara pembayaran yang dilakukan antara pengguna jasa dan penyedia jasa pada saat pelaksanaan proyek akan membawa dampak yang cukup signifikan bagi penyedia jasa untuk menyiapkan sejumlah dana tertentu. Dimana dana yang disediakan tersebut akan dipergunakan untuk menjaga kondisi arus kas proyek tetap positif atau terhindar dari kondisi defisit. Penelitian ini bertujuan untuk memberi masukan bagi penyedia jasa konstruksi dalam melakukan perhitungan penyediaan dana yang paling menguntungkan dimana metode pembayaran yang diamati adalah metode pembayaran stage payment.

Keywords

optimization; linear programming; funding; cash flow; contract form; construction; optimasi; pemrograman linier; pendanaan; arus kas; bentuk kontrak; konstruksi

Full Text:

PDF

References

Anggoro, Andi Sri Purwo., 2009. Analisis Cash flow (Studi Kasus Pembangunan Rumah Sakit dr. Sardjito Yogyakarta). Tugas Akhir Teknik Sipil Universitas Islam Indonesia.

Armstrong, Scott J., 2002. Principles of Forecasting. New York: Kluwer Academic Publisher.

Biro Administrasi PT Hutama Karya, 2006. “Sosialisasi Manual Akuntansi PT. Hutama Karya.” KPTS No.2189/KPTS/68/2006 Tanggal 26 Juni 2006

Ervianto, Wulfram I., 2005. Manajemen Proyek Konstruksi. Yogyakarta : Andi.

Ghozali, I. dan A. Chariri., 2007. Teori Akuntansi. Semarang: Badan Penerbit Universitas Diponegoro

Heizer, Jay & Render, Barry., 2006. Buku 1 Operations Management. Jakarta: Salemba Empat.

Ikatan Akuntan Indonesia, 2007. Standar Akuntansi Keuangan. PSAK. No 34: Akuntansi Kontrak Konstruksi. Jakarta: Salemba Empat

Iman Soeharto., 1999. Manajemen Proyek. Jakarta: Erlanga.

Joni., 2005. Evaluasi Penerapan Saat Pengakuan Pendapatan Terhadap Kelayakan Laba Secara Periodik (Studi Kasus pada Perusahaan Konstruksi). Jurnal Ilmiah Akuntansi. Vol. 5, No. 1, h.71-93

Partono, Windu., 2007. Evaluasi Kelayakan Pendanaan Proyek dengan Teknik Pemrograman Linier. Jurnal Teknik Sipil Vol. 28 hal 1-8. Semarang

Preseiden Republik Indonesia, Peraturan Presiden Pengadaan Barang dan Jasa Pemerintah No. 54 Tahun 2010, 2010

Subianto, Agus., 2005. Penerapan Pemrograman Linier pada Produksi Beton Ready Mix. Master Tesis Teknik Sipil Institut Teknologi Bandung.

Yasin, H. Nazarkhan., 2006. Mengenal Kontrak Konstruksi di Indonesia. Jakarta: PT. Gramedia Pustaka Utama.