[1]
Muskibah, M., Yetniwati, Y., Sasmiar, S. and Holish, A.M. 2023. Force Majeure During COVID-19 Outbreaks: Case of the Cancellation and Termination of Government Construction Contracts. Journal of Indonesian Legal Studies. 8, 1 (May 2023), 129-158. DOI:https://doi.org/10.15294/jils.v8i1.68937.