Muskibah, M., Yetniwati, Y., Sasmiar, S., & Holish, A. M. (2023). Force Majeure During COVID-19 Outbreaks: Case of the Cancellation and Termination of Government Construction Contracts. Journal of Indonesian Legal Studies, 8(1), 129-158. https://doi.org/10.15294/jils.v8i1.68937