FAKTOR PENENTU KESUKSESAN PROYEK RANCANG-BANGUN

Bambang E. Yuwono(1),


(1) Jurusan Teknik Sipil Fakultas Teknik Sipil dan Perencanaan Universitas Trisakti

Abstract

Key Success Factors have been recognized in the management of design-build project and the factors are usually gained through results of analysis on questionnaires collected from conducted surveys. However, so far such factors have not been justified through modeling of interactions from various factors that influence the success of design-build projects. Factors assumed  to affect the success were then put into models and examined using SEM (Structural Equation Modeling) methodology to describe, quantify and demonstrate the interaction influences of various factors on the success of design-build projects. The results of modeling and examination showed the existence of direct and indirect factors as well as dominant and less dominant factors. From the research, it could be revealed that the determinant success factors of design-build projects were the direct and predominant factors of the projects including management capabilities of the projects’ owners, management capabilities of design-build team, symbiosis between projects’ owners and the design-build team. The symbiosis was dominated by defining the scope of project.

Faktor kunci kesuksesan (Key Success Factors) telah dikenal dalam pengelolaan proyek konstruksi rancang-bangun dan faktor kunci kesuksesan tersebut biasanya didapatkan melalui hasil analisis terhadap kuesioner yang diterima dari survai yang telah dilakukan, namun sejauh ini belum pernah dilakukan pembuktian melalui pemodelan interaksi berbagai faktor yang mempengaruhi kesuksesan proyek rancang-bangun. Faktor-faktor yang diduga mempengaruhi kesuksesan proyek rancang-bangun kemudian dimodelkan dan diuji menggunakan metodologi SEM (Structural Equation Modeling) untuk mendeskripsikan, mengkuantifikasikan dan mendemonstrasikan pengaruh interaksi berbagai faktor-faktor terhadap kesuksesan proyek rancang-bangun. Hasil dari pemodelan dan pengujian pengaruh interaksi berbagai faktor terhadap kesuksesan proyek rancang-bangun adalah adanya faktor yang langsung mempengaruhi kesuksesan proyek rancang-bangun dan ada yang berpengaruh tidak langsung, terdapat pula faktor yang dominan dan faktor yang kurang dominan. Dari hasil penelitian ini dapat diungkap bahwa faktor penentu kesuksesan proyek rancang-bangun adalah faktor yang berpengaruh langsung dan dominan terhadap kesuksesan proyek rancang-bangun yaitu kemampuan manajemen pemilik proyek, kemampuan manajemen tim rancang-bangun, simbiosis antara pemilik proyek dan tim rancang bangun. Simbiosis antara pemilik proyek dengan tim rancang-bangun didominasi oleh pendefinsian lingkup proyek.


Keywords

design-build; key factors; interaction; success; symbiosis; rancang-bangun; faktor-penentu; interaksi; kesuksesan; simbiosis

Full Text:

PDF

References

Ashley, D.B., Lurie, C.S. dan Jaselskis, E.J..

Determinants of Construction Projects Success, Proj. Mgmt. J., 18(2), 69-77.

Chan, A.P.C., Ho, D.C.K. dan Tam, C.M.. 2001. Design/Build Project Success Factors : Multivariate Analysis, J. Constr. Eng. Manage, 27(2), 93-100.

Chan, A.P.C., Scott, D. dan Lam, W.M. (2002), Framework of Success Criteria for Design/Build Projects, Journal of Manage-ment in Engineering, ASCE, 18(3), 120-127.

Cheng, R.T.L..1995. Design and Build – Contractor’s Role , Proc., Des. and Build Projects – Int. Experiences, Int. Congr. On Constr., 232-241.

Chua, D.K.H., Kog, Y.C. dan Loh, P.K.. 1999. Critical Success Factors for Different Project Objectives, Journal of Management in Engineering, ASCE, 125(3), 142-150.

Hair, J.F., Anderson, R.E., Tatham, R.L. dan Black, W.C. 1998. Multivariate Data Analysis, Prentice-Hall, Inc, 577-666.

Ho, T. 1996. Design and Build : Challenge & Response, Proc., Des. and Build Procurement Symp., 1-11.

Kok, S.H. 1995. Design and Build – The Local Experience (With Public Client), Proc., Des. and Build Projects – Int. Experiences, Int. Congr. On Constr., 223-226.

Mo, J.K. dan Ng, L.Y. 1997. Design and Build Procurement Method in Hong Kong – An Overview, Proc., CIB W92 Procurement – A Key to Innovation, Procurement Sys. Symp., 453-462.

Mohsini, R.A. dan Davidson, C.H. 1992. Determinants of Performance in the Traditional Building Process, Constr. Mgmt. and Economics, 10, 343-359.

Molenaar, K.R. dan Gransberg, D.D. 2001. Design-Builder Selection For Small Highway Projects, Journal of Management in Engineering, ASCE, 17(4).

Molenaar, K.R. dan Songer, A.D. 1998. Model for Public Sector Design-Build Project Selection, J. Constr. Eng. Manage., 124(6), 467-479.

Molenaar, K.R., Songer, A.D. dan Barash, M. 1999. Public-sector design/build evolution and performance, Journal of Management in Engineering, ASCE, 15(2).

Potter, K.J. dan Sanvido, V. 1994. Design/Build Prequalification System, Journal of Management in Engineering, ASCE, 10(2).

Pribadi, K.S. dan Yuwono, B.E. 2003. Application of Design-Build Contract in Infrastructure Projects : Lessons Learned from Energy Project in Indonesia, The ninth East Asia-Pacific Conference on Structural Engineering and Construction, Bali – Indonesia.

Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M. dan Coyle, M. 1992. Critical Success Factors for Construction Projects, J. Constr. Eng. Manage., 118(1), 94-111.

Songer, A.D. dan Molenaar, K.R. 1997. Project Characteristics for Successful Public-sector Design-Build, J. Constr. Eng. Manage., 123(1), 34-40.

Sugiyono. 2001. Metode Penelitian Bisnis, Penerbit Alfabeta Bandung

Turner, D.F. 1995. Design and Build Contract Practice, Longman Scientific & Technical, 3-14

Refbacks

  • There are currently no refbacks.